Railway signalling works | Tenderlake

Railway signalling works

Contract Value:
GBP 12M - 12M
Notice Type:
Contract Notice
Published Date:
07 December 2016
Closing Date:
09 January 2017
Location(s):
UK UNITED KINGDOM
UKK3 Cornwall and Isles of Scilly (UK UNITED KINGDOM)
Description:
West Section — Phase 1 Cornwall Capacity Enhancement Scheme (CCES).

The Cornwall Capacity Enhancement Scheme (Phases 1 and 2) incorporates the upgrade and re-control of signalling from local control points at Plymouth Panel plus nine mechanical signal boxes throughout Cornwall and increases the capacity of service between Penzance and Plymouth.

The scope of this Project is specifically for Phase 1 covering the ‘West’ section only comprising Guide to Rail Investment Projects (GRIP) stages 4b-8 covering the design, construction, delivery and commissioning of:

— additional capacity of service between Par signal box and Penzance;

— circa 12 new intermediate block signals;

— 6 Miniature Stop Lights Crossings (MSLs) & 1 Manually Controlled Barrier with Obstacle Detection (MCB-OD); and

— associated signalling works.



CCES Scheme Overview:

The principal driver for the CCES scheme (of which the works which are the subject of this Notice form a part) is to provide Cornwall County Council with a half-hourly local service from Plymouth to Penzance.

The scheme will be delivered in two phases — Phase 1 and Phase 2.

— Phase 1 is to provide Cornwall County Council with a half hourly local service between Plymouth and Penzance by December 2018.

— Phase 2 is to renew life expired signalling assets and in addition realise operating cost savings with the closure of ten signal box locations.

Phase 1 will be divided into two Sections namely East and West with the dividing line at Par Signal Box.

Project Description:

This Project, and therefore the scope of this Notice, is for the West Section — Phase 1 CCES Contract GRIP 4b — 8 Design, Construct and Commission ONLY — from Par Signal Box to Penzance, which supports the introduction of the new timetable in December 2018.

The overall scope of the Cornwall Capacity Enabling Scheme Phase 1 (West) covers the line of route currently controlled by Truro Signal Box: Par Signal Box to Penzance, within the mileage limits described below.

Engineering Line References & Mileages:

MLN3 300mi 57ch to 305mi 65ch

MLN4 305mi 67ch to 320mi 67ch

Maintenance Units:

Par Maintenance S & T / PWAY Depot

Further details on the technical scope and specific contract requirements are set out in the procurement documents provided.

Download full details as .pdf
The Buyer:
Network Rail Infrastructure Limited
CPV Code(s):
34632100 - Mechanical signalling
34632200 - Electrical signalling equipment for railways
34632300 - Electrical installations for railways
34942000 - Signalling equipment
45234115 - Railway signalling works
45234140 - Level crossing construction works
45316200 - Installation of signalling equipment
71310000 - Consultative engineering and construction services
71311230 - Railway engineering services
71320000 - Engineering design services
71334000 - Mechanical and electrical engineering services