The building consists predominantly of wood (cross-laminated timber, in some areas in visible quality) and also of concrete, also in visible quality in some areas. Due to the hillside situation, the building has a partial basement. The foundation of the hall, which has no basement, is stepped from the basement level.
The basement serves school purposes (lessons, after-school care) and also consists of exposed concrete walls and interior walls in cross-laminated timber construction.
The parts that come into contact with the earth must be properly insulated and provided with perimeter insulation.
The wall between the staircase and the non-basement part of the sports hall is designed as a white bathtub.
The services described below include steel construction work of the balcony construction as well as locksmith work of the associated railings and other crash railings in the area of the outdoor facilities. All components must be hot-dip galvanized.
Key data:
Balcony construction: approx. 1,877 KG
Railings and handrails: approx. 93 m
The building consists predominantly of wood (cross-laminated timber, in some areas in visible quality) and also of concrete, also in visible quality in some areas. Due to the hillside situation, the building has a partial basement. The foundation of the hall, which has no basement, is stepped from the basement level.
The basement serves school purposes (lessons, after-school care) and also consists of exposed concrete walls and interior walls in cross-laminated timber construction.
The parts that come into contact with the earth must be properly insulated and provided with perimeter insulation.
The wall between the staircase and the non-basement part of the sports hall is designed as a white bathtub.
The services described below include steel construction work of the balcony construction as well as locksmith work of the associated railings and other crash railings in the area of the outdoor facilities. All components must be hot-dip galvanized.
Key data:
Balcony construction: approx. 1,877 KG
Railings and handrails: approx. 93 m