Heating, ventilation and air-conditioning installation work | Tenderlake

Heating, ventilation and air-conditioning installation work

Contract Value:
-
Notice Type:
Contract Notice
Published Date:
05 June 2023
Closing Date:
28 June 2023
Location(s):
DE11A Schwäbisch Hall (DE Germany/DEUTSCHLAND)
Description:
Heating and cooling supply systems

New construction of the Schwäbisch Hall correctional facility

Heating and cooling supply systems

- 6 heat buffer tanks with the following nominal volumes: 1 x 10,000l, 4 x 5000l and 1 x 2000l

- 1 cold buffer tank with a nominal volume of 5000l

- 1 water-cooled chiller with a cooling capacity of 500kW

- 3 compact heating manifolds (thermally separated)

- 1 refrigeration distributor (thermally separated)

- Approx. 20 pumps with heads between 2 and 9m

- 1 Glykolpumpe

- 5 fresh water stations with the following maximum tapping capacities: Approx. 8500m2 underfloor heating for heating and cooling (staple system)

- Approx. 160 distributors underfloor heating

- Approx. 70 radiators

- 12 Deckenstrahlplatten

- Ca. 27 Umluftkühlgeräte

- Approx. 7000m copper pipe DN12 to DN50 (+insulation)

- Approx. 2400m steel pipe DN25 to DN200 (+insulation)

- Approx. 450m stainless steel pipe DN20 to DN50 (+insulation)

- Mobile oil heaters for construction heating

- 18 oil tanks with a nominal volume of 1500l each

Download full details as .pdf
The Buyer:
Klinikum am Weissenhof Zentrum für Psychiatrie Weinsberg, AöR
CPV Code(s):
45331000 - Heating, ventilation and air-conditioning installation work
45331231 - Installation work of refrigeration equipment