Description:
Comprehensive supply of electricity to the facilities of the Maritime Branch of the Border Guard

The subject of the contract is a comprehensive supply of electricity, including sales and distribution, to the facilities of the Maritime Branch of the Border Guard. The order is divided into 25 parts.

Detailed information on the subject of the contract can be found in the Specifications of the Terms of The Contract.

Part 1

Place of order execution: Border Guard Post in Kołobrzeg, 7 Sikorskiego Street.

Connection power 32 kW while maintaining the power factor tg fi not more than 0,4 according to

with the applicable quality standards of customer service specified in executive acts issued on the basis of the Energy Law.

Place of electricity supply: ZK – energy cabinet outside the building.

The measuring and settlement system consists of the following measuring devices:

Active energy meter (3 – phase) No. 50002575.

The ordering party belongs to the tariff group C21 and to the V connection group.

Expected consumption over the term of the contract will be 170,243.7 kWh

Part of the 10th

Place of order: Nowa Karczma Observation Point in Krynica Morska commune

Oj 2/1.

Contractual power of 31 kW while maintaining the power factor tg fi ≤ 0.4 in accordance with the applicable quality standards of customer service specified in the implementing acts issued

on the basis of the Energy Law.

Place of electricity supply: ZK - power cabinet. free-standing at the T-6019 station.

The measuring and settlement system consists of the following measuring devices:

Active energy meter (3 - phase) No. 88055665.

The Ordering Party belongs to the tariff group C12a and to the V connection group.

The expected consumption over the term of the contract will be: 204 688.5 kWh.

Part of the 11th

Place of execution of the contract: Rozewie Observation Point in the military complex 4181, Rozewie plot No. 488, Władysławowo commune.

Conventional power 17 kW while maintaining a power factor tg fi of not more than 0,4 according to

with the applicable quality standards of customer service specified in executive acts issued on the basis of the Energy Law.

Place of electricity supply: ZK free-standing power cabinet.

The measuring and settlement system consists of the following measuring devices:

Active energy meter (3 - phase) No. 10503915.

The Ordering Party belongs to the tariff group C12a and to the V connection group.

The expected consumption over the term of the contract will be: 44 097.9 kWh.

Part of the 12th

Place of order execution: Białogóra Observation Point in military complex 4121, plot No. 2/4, 2/5, Krokowa commune.

Contractual power of 17 kW while maintaining the power factor tg fi ≤ 0.4 in accordance with the applicable quality standards of customer service specified in the implementing acts issued

on the basis of the Energy Law.

Place of electricity supply: ZK free-standing power cabinet.

The measuring and settlement system consists of the following measuring devices:

Active energy meter (3 - phase) No. 10561982.

The Ordering Party belongs to the tariff group C12a and to the V connection group.

The expected consumption over the term of the contract will be: 54 183.4 kWh.

Part of the 13th

Place of order execution: Łazy Observation Point in military complex 4613,

plot No. 26.

Conventional power 17 kW while maintaining a power factor tg fi of not more than 0,4 according to

with the applicable quality standards of customer service specified in executive acts issued on the basis of the Energy Law.

Place of electricity supply: ZK free-standing power cabinet.

Active energy meter (3 - phase) No. 71248698.

The Ordering Party belongs to the tariff group C12a and to the V connection group.

The expected consumption over the term of the contract will be: 56 897,492 kWh.

Part of the 14th

Place of order execution: Gąski Observation Point in military complex 4251,

plot No. 314/1.

Contractual power of 17 kW while maintaining the power factor tg fi ≤ 0.4 in accordance with the applicable quality standards of customer service specified in the implementing acts issued

on the basis of the Energy Law.

Place of electricity supply: ZK free-standing power cabinet.

The measuring and settlement system consists of the following measuring devices:

Active energy meter (3 - phase) No. 72070419.

The Ordering Party belongs to tariff group C 12a and to the V connection group.

The expected consumption over the term of the contract will be: 58 796,625 kWh.

Part of the 15th

Place of order execution: Darłówko Observation Point plot No. 2/21.

Contractual power 17 kW while maintaining the power factor tg fi ≤ 0.4 according to

with the applicable quality standards of customer service specified in executive acts issued on the basis of the Energy Law.

Place of electricity supply: ZK free-standing power cabinet.

The measuring and settlement system consists of the following measuring devices:

Active energy meter (3 - phase) No. 71248596.

The Ordering Party belongs to the tariff group C12a and to the V connection group.

The expected consumption during the term of the contract will be: 57 193 kWh.

Part of the 16th

Place of execution of the contract: Łeba Observation Point in the military complex No. 4063, plots No. 41/1, 41/2.

Contractual power of 17 kW while maintaining the power factor tg fi ≤ 0.4 in accordance with the applicable quality standards of customer service specified in the implementing acts issued

on the basis of the Energy Law.

Place of electricity supply: ZK free-standing power cabinet.

The measuring and settlement system consists of the following measuring devices:

Active energy meter (3 - phase) No. 04024756/3.

The Ordering Party belongs to the tariff group C12a and to the V connection group.

The expected consumption during the term of the contract will be: 40 884,731 kWh.

Part of the 17th

Place of execution of the contract: Czołpino Observation Point in the military complex 4126, plot No. 20/8.

Contractual power of 17 kW while maintaining the power factor tg fi ≤ 0.4 in accordance with the applicable quality standards of customer service specified in the implementing acts issued

on the basis of the Energy Law.

Place of electricity supply: ZK free-standing power cabinet.

The measuring and settlement system consists of the following measuring devices:

Active energy meter (3 - phase) No. 50642263/4.

The Ordering Party belongs to the tariff group C12a and to the V connection group.

The expected consumption over the term of the contract will be: 56 823.8 kWh.

Part of the 18th

Place of order: Observation Point Ustka - Uroczysko 4, plot No. 1198/9.

Contractual power of 17 kW while maintaining the power factor tg fi ≤ 0.4 in accordance with the applicable quality standards of customer service specified in the implementing acts issued

on the basis of the Energy Law.

Place of electricity supply: ZK free-standing power cabinet.

The measuring and settlement system consists of the following measuring devices:

Active energy meter (3 - phase) No. 94216046/2.

The Ordering Party belongs to the tariff group C12a and to the V connection group.

The expected consumption during the term of the contract will be: 56 614.5 kWh.

Part of the 19th

Place of execution of the order: Jarosławiec Observation Point, Nadmorska Street plot No. 251.

Contractual power of 17 kW while maintaining the power factor tg fi ≤ 0.4 in accordance with the applicable quality standards of customer service specified in the implementing acts issued

on the basis of the Energy Law.

Place of supply of electricity: ZK free-standing power cabinet with a 3-phase meter for measuring active electricity No. 134629/3.

The Ordering Party belongs to the tariff group C12a and to the V connection group.

The expected consumption during the term of the contract will be: 57 412.6 kWh.

Part 2

Place of order execution: Border Guard Post in Kołobrzeg, 4a Wiosenna Street.

Connection power 140 kW while maintaining the power factor tg fi ≤ 0.4 according to

with the applicable quality standards of customer service specified in executive acts issued on the basis of the Energy Law.

Place of electricity supply: ZK – measuring cable cabinet.

The contractor will supply electricity via a cable connection from 3-phase connections.

The measurement of the power and electricity consumed by the consumer is carried out at a voltage of 0.4 kV.

The measuring and settlement system consists of the following measuring devices:

Active energy meter (3 - phase) No. 42773464.

The Ordering Party belongs to the tariff group C21 and to the IV connection group.

The consumption of contractual power broken down by months is included in the Specification of the Terms of The Contract.

The expected consumption over the term of the contract will be 256 521.3 kWh.

Part of the 20th

Place of order execution: Kołobrzeg Observation Point in the military complex 4252, Kołobrzeg, Wiosenna Street, plot No. 3/7.

Contractual power of 17 kW while maintaining the power factor tg fi ≤ 0.4 in accordance with the applicable quality standards of customer service specified in the implementing acts issued

on the basis of the Energy Law.

Place of electricity supply: ZK free-standing power cabinet with 3 phase meter for measuring active electricity No. 04007015.

The Ordering Party belongs to tariff group C 12a and to the V connection group.

The expected consumption over the term of the contract will be: 56 148.41 kWh.

Part of the 21st

Place of order execution: Skowronki Observation Point in Sztutowo commune plot No. 781/2, 781/5.

Contractual power of 17 kW while maintaining the power factor tg fi ≤ 0.4 in accordance with the applicable quality standards of customer service specified in the implementing acts issued

on the basis of the Energy Law.

Place of electricity supply: ZK free-standing power cabinet at the fence of the plot.

The measuring and settlement system consists of the following measuring devices:

Active energy meter (3 - phase) No. 10780578.

The Ordering Party belongs to the tariff group C12a and to the V connection group.

The expected consumption over the term of the contract will be: 64 738.1 kWh.

Part of the 22nd

Place of execution of the contract: Mrzeżyno Observation Point in the military complex 4064, plot No. 9.

Contractual power of 17 kW while maintaining the power factor tg fi ≤ 0.4 in accordance with the applicable quality standards of customer service specified in the implementing acts issued

on the basis of the Energy Law.

Place of electricity supply: ZK free-standing power cabinet with a 3-phase meter for measuring active electricity No. 62336401.

The Ordering Party belongs to tariff group C 12a and to the V connection group.

The expected consumption during the term of the contract will be: 60 533.7 kWh.

Part of the 23rd

Place of order execution: Niechorze Observation Point in military complex 4281, plot No. 366.

Contractual power 17 kW while maintaining the power factor tg fi ≤ 0.4 according to

with the applicable quality standards of customer service specified in executive acts issued on the basis of the Energy Law.

Place of electricity supply: ZK free-standing power cabinet with 3 phase meter for measuring active electricity No. 62376829.

The Ordering Party belongs to tariff group C 12a and to the V connection group.

The expected consumption over the term of the contract will be: 64 216 kWh.

Part of the 24th

Place of order execution: Dziwnów Observation Point in military complex 4301, plot No. 11.

Contractual power 17 kW while maintaining the power factor tg fi ≤ 0.4 according to

with the applicable quality standards of customer service specified in executive acts issued on the basis of the Energy Law.

Place of electricity supply: ZK free-standing power cabinet with 3 phase meter for measuring active electricity No. 11649076.

The Ordering Party belongs to the tariff group C12a and to the V connection group.

The expected consumption during the term of the contract will be: 57 486.2 kWh.

Part of the 25th

Place of order execution: Headquarters of the Maritime Branch of the SG, 80-563 Gdańsk, 35 Oliwska Street. Connection power 600 kW, while maintaining the power factor tg fi ≤ 0,4 according to

with the applicable quality standards of customer service specified in executive acts issued on the basis of the Energy Law.

The contractor will supply electricity via a 3x120 Z T-1046 cable connection from 3-phase connections powered by: from the 15/04 transformer station – a receiving device with a voltage of 0.4 kV.

Place of supply of electricity: transformer terminals on the low voltage side.

The consumption of contractual power from 1 December 2022 to 31 December 2024 broken down by months is included in the Specification of the Terms and Conditions of the Contract.

The measuring and billing system consists of the following measuring devices:

active energy meter No 54391262.

The Ordering Party belongs to connection group IV and tariff group C22b,

The expected energy consumption during the term of the contract will be:

Day fare: 978 163,875 kWh, night fare: 381 635 184,0833 kWh.

Part 3

Place of order: Kashubian Border Guard Squadron in Gdańsk Westerplatte

Major H. Sucharskiego Street.

Connection capacity 156kW installed capacity while maintaining the power factor tg fi ≤ 0.2 in accordance with the applicable quality standards of customer service specified in the implementing acts issued on the basis of the Energy Law.

The contractor will supply electricity via a cable connection 3xNA2XSY 240 NR 2317

With T-16056 with a voltage of 0.4 kV, place of supply of electricity: AP station rails 60 x 5 W

T-16532.

The measuring and settlement system consists of the following measuring devices:

Active energy meter (3 - phase) No. 42482783.

The Ordering Party belongs to the tariff group C21 and to the IV connection group.

The consumption of contractual power broken down by months is included in the Specification of the Terms of The Contract.

The expected consumption over the term of the contract will be 933 721.8 kWh.

Part 4

Place of order execution: OSK "Magnolia" in SOPOT, 100 Haffnera Street.

Contractual power of 18 kW while maintaining the power factor tg fi ≤ 0.4 in accordance with the applicable quality standards of customer service specified in the implementing acts issued

on the basis of the Energy Law.

Place of supply of electricity: Cable and Measurement Connector.

The measuring and settlement system consists of the following measuring devices:

Active energy meter (3 - phase) No. 39941/1.

The Ordering Party belongs to the tariff group C12b and to the V connection group.

The expected consumption over the term of the contract will be: 41 234.4 kWh.

Part of the 5th

Place of order execution: PSG Władysławowo Grupa Zamiejscowa in Łeba, 6 Jachtowa Street.

Contractual power of 40 kW while maintaining the power factor tg fi ≤ 0.4 in accordance with the applicable quality standards of customer service specified in the implementing acts issued

on the basis of the Energy Law.

Place of electricity supply: Cable connector ZK-1

The measuring and settlement system consists of the following measuring devices:

Active energy meter (3 - phase) No. 12378039/2.

The Ordering Party belongs to the tariff group C11 and to the V connection group.

The projected consumption over the term of the contract will be 131,540,174 kWh.

Part of the 6th

Place of execution of the order: Border Guard Post in Ustka, Uroczysko 4 Street.

Contractual power of 15 kW, while maintaining the power factor tg fi ≤ 0.4 in accordance with the applicable quality standards of customer service specified in the implementing acts issued

on the basis of the Energy Law.

Place of electricity supply: ZK – power cabinet.

The measuring and settlement system consists of the following measuring devices:

Active energy meter (3 - phase) No. 65463/1.

The Ordering Party belongs to the tariff group C11 and to the V connection group.

The expected consumption over the term of the contract will be 90,771.80 kWh.

Part of the 7th

Place of execution of the contract: Border Guard Post in Władysławowo, 7 Morska Street.

Contractual power of 60 kW while maintaining the power factor tg fi ≤ 0.4 in accordance with the applicable quality standards of customer service specified in the implementing acts issued

on the basis of the Energy Law.

Place of electricity supply: ZK free-standing power cabinet.

The measuring and settlement system consists of the following measuring devices:

Active energy meter (3 - phase) No. 03218674.

The Ordering Party belongs to the tariff group C21 and to the IV connection group.

The projected consumption over the term of the contract will be 178 914.7 kWh.

Part of the 8th

Place of order execution: Border Guard Post in Ustka, 5 Marynarki Polskiej Street.

Contractual power of 8 kW while maintaining the power factor tg fi ≤ 0.4 in accordance with the applicable quality standards of customer service specified in the implementing acts issued

on the basis of the Energy Law.

Place of supply of electricity: current terminals at the outlet of the wires from the main protection in the connector towards the customer's installation.

The measuring and settlement system consists of the following measuring devices:

Active energy meter (3 -phase) 70770138/6.

The Ordering Party belongs to the tariff group C11 and to the V connection group.

The expected consumption over the duration of the contract will be 98 824.1 kWh.

Part of the 9th

Place of order execution: Observation Point in Jastarnia, Zdrojowa Street dz. 13/1.

Conventional power 20 kW while maintaining the power factor tg fi ≤ 0.4 in accordance with

with the applicable quality standards of customer service specified in executive acts issued on the basis of the Energy Law.

Place of electricity supply: ZK - power cabinet. Detached

The measuring and settlement system consists of the following measuring devices:

Active energy meter (3 – phase) No 10576159/20.

The Ordering Party belongs to the tariff group C12a and to the V connection group.

The expected consumption during the term of the contract will be: 53 433.6 kWh.