— demolition and construction of the Schwarzach Bridge,
— demolition of the existing building,
— new construction as reinforced concrete arch bridge with raised superstructure,
— support widths 11.00 m +2 x 10.00 m + 14.00 m + 2 x 10.00 m + 11.00 m,
— width 60,72 m.
demolition, new construction of the 7-field Schwarzachbrücke:
— 200 m piping DN 2400,
— 300 m piping DN 1200,
— earthworks 58 000 m
— 2,000 m
— 1,400 t rebar,
— 11 400 m
— 4 750m