With the present project, stone and block protection is achieved through the construction of a rockfall protection structure. For this purpose, on the St. Moritz - Tirano line near Campascio (km 55,553 - km 56,019), the RhB route will be shifted towards the settlement area and a drop floor with a new dam will be built in the area of the existing railway embankment. The existing slope will be partially removed.
With the present project, stone and block protection is achieved through the construction of a rockfall protection structure. For this purpose, on the St. Moritz - Tirano line near Campascio (km 55,553 - km 56,019), the RhB route will be shifted towards the settlement area and a drop floor with a new dam will be built in the area of the existing railway embankment. The existing slope will be partially removed.