A4 FBE Bautzen-West - Weißenb., FR Gö., BA 1, Lot 2 - Earthworks and superstructure
Gross amounts:
1) Free route incl. junction - road construction:
Mowing the lawn 19,520.0 m²
Attachments Adjusting the height of road drains 68.0 hrs
Adjust manhole covers in height 10.0 pcs
Dismantling, temporarily storing or transporting guide posts 47.0 pcs
Erecting guide posts incl. foundation 10.0 pcs
Remove banquet 2,460.0 m³
Manufacture banquet according to profile 2015,0 m³
Taking layers without binders 275.0 m³
Frostschutzschicht restore 900,0 t
Asphalt separation 14,875.0 m
Asphalt cuttering (surface course) 52,325.0 m²
Asphaltfräsen (Binderschicht) 48.475,0 m²
Asphalt cuttering (base course) 18,960.0 m²
Cleaning the underlay (high pressure water - rotary jet technology) 61,720.0 m²
Paving asphalt base course 4,950.0 t
Paving asphalt binder course 10,030.0 t
Paving asphalt surface course 56,060 m²
Making a drainage channel from mastic asphalt 740.0 m
Making a connection as a joint 9,410.0 m
Making edge waterproofing 1,810.0 m
Dismantling and renewing board 80.0 m
2) Free track - civil engineering:
Cover LSW renewal / installation 435.0 m
Replace LSW elements made of wood 103.0 m²
Sealing cap on anchor plates FRS 229,5 m²
Railing post base - repair corrosion protection 62.0 pcs
Railing post base - mortar post foot renew 62,0 pcs
Railing post base - mortar anchor plate renew 90,0 pcs
Renew bridge drains 19.0 pcs
Renew drainage pipe incl. fittings 36.0 m
Renew superstructure waterproofing 71.0 m²
Renewal of road crossing construction according to RIZ Übe1 38.2 m
Climbing protection on vorh. Install railings 78.5 m