According to the technical task of purchasing construction works for 110 kV switchgear structures with dependencies, two 110 kV power transmission lines, the Supplier shall have:
a) to prepare and coordinate a work project with the state enterprise Ignalina Nuclear Power Plant (hereinafter referred to as the Customer or the Buyer) and the electricity transmission system operator Litgrid AB (hereinafter referred to as Litgrid AB);
b) according to the submitted technical project and the work project agreed with the Customer and Litgrid AB, to build 110 kV switchgear structures with dependencies, to connect two 110 kV power transmission lines and constructed power grids to the 330/110/10 kV IAE TP 110 kV switchgear.
According to the submitted technical project No. 745/2 "Electricity networks, Visaginas municipality. in the territory and the project for the construction of electricity networks in Visaginas municipality, Drūkšiniai village, Elektros str. 4" (hereinafter referred to as technical project No. 745/2) to prepare and coordinate with the IAE and the transmission system operator Litgrid AB (hereinafter referred to as Litgrid AB) the work project and to build 110 kV switchgear structures with dependencies in accordance with the submitted Technical Project No. 745/2 and the work project agreed with IAE and Litgrid AB, connect two 110 kV power transmission lines and constructed power grids to the 330/110/10 kV IAETP 110 kV switchgear.