The subject of the contract is the preparation of a corridor study, materials for the application for a decision on environmental conditions along with its obtaining, the program concept for the investment entitled "North-western bypass of Racibórz". The documentation is to include the preparation of all materials necessary for the Contractor to obtain, on behalf of the Contracting Authority, a legally valid Decision on environmental conditions and then the development of a functional and utility program.
The execution of the order will be divided into the following stages:
•Stage I corridor study.
•Stage II Environmental report.
•Stage III B Environmental decision.
•Stage IV Preliminary design.
Details of the task are described in the Order Item Description and the order documents.
Due to the limited number of characters.
The subject of the contract is the preparation of a corridor study, materials for the application for a decision on environmental conditions along with its obtaining, the program concept for the investment entitled "North-western bypass of Racibórz". The documentation is to include the preparation of all materials necessary for the Contractor to obtain, on behalf of the Contracting Authority, a legally valid Decision on environmental conditions and then the development of a functional and utility program.
The execution of the order will be divided into the following stages:
•Stage I corridor study.
•Stage II Environmental report.
•Stage III B Environmental decision.
•Stage IV Preliminary design.
Details of the task are described in the Order Item Description and the order documents.
Due to the limited number of characters.