Highways engineering services

Contract Value:
-
Notice Type:
Contract Notice
Published Date:
24 July 2023
Closing Date:
25 September 2023
Location(s):
FR104 Essonne (FR FRANCE)
FRB01 Cher (FR FRANCE)
FRB04 Indre-et-Loire (FR FRANCE)
FRB05 Loir-et-Cher (FR FRANCE)
FRG04 Sarthe (FR FRANCE)
Description:
Project management and project management assistance for the complex repair program on engineering structures (jacking, sealing, painting of sheet pile walls)

Service provision to carry out a complete MOE and AMO mission in the study and realization phases until the acceptance of the works.

The work programme concerns complex repairs (in terms of technicality and sections of motorways with very high traffic requiring special operating measures and/or complex phasing) on engineering structures of the COFIROUTE network. It is divided into three lots:

•Lot n°1: Jacks-Sealing PI/PS A10 South:

•Lot n°2: Jacks-Sealing PI/PH A10 Common Core, A10 North and A11

•Lot n°3: Painting of sheet pile walls, A10 Crossing Tours

The contract consists of missions of main MOE in the study and implementation phases, obtaining administrative authorizations, and AMO in the studies and implementation phases.

The incumbent will also be responsible for ensuring the coordination and coherence of the studies as a whole. Relations with the State and local authorities will be ensured by the Contracting Authority, with the assistance of the contracting authority.

AMO/MOE for jacking and sealing work PI/PS A10 South (operation n°1)

The works concerned by the works of lot n ° 1 (operation 1) are:

the A10PI242/10

the A10PI207/5

the A10PS198/28

the A10PS209/7

The project management and project management assistance contract for operation 1 includes one (1) firm tranche and three (3) optional tranches.

• The firm tranche covers the design studies of the entire program for the 4 bridges (A10PI242/10 + A10PI207/5 + A10PS198/28 + A10PS209/7) and work on the A10PI242/10.

o Component 0: data recovery and validation multi-year program, definition of diagnostic needs and operational measures;

o Component 1: "project management mission"

In the study phase, for the entire operation program;

• Preliminary draft (AVP)

• ESCR Establishment, Operational Measures and Management Relations

• Project (PRO)

• Assistance in the award of Works Contracts (ACT)

• BIM

In the works phase, for the follow-up of the work on the A10PI242/10;

• VISA of execution studies

• Direction of the execution of the works (DET)

• Assistance for work acceptance operations (AOR)

• Scheduling, steering and coordination of the operation (OPC)

• Studies for loading test

• Follow-up of the perfect completion

o Part 2: "project management assistance mission"

In the study phase, for the entire operation program for the 4 bridges;

• Management of missions of investigations and complementary studies (asbestos lead, PAH diagnostics, concrete etc.) including DESC for complementary in-situ interventions,

• Accessibility of the work to the work – conventions – study phase

• Network management

In the works phase, for the follow-up of the work on the A10PI242/10;

• Management of external controls (waterproofing, concrete, etc.)

• Accessibility of the works to the work – agreements – works phase

• Initial detailed inspection (IDI) after work

The 3 optional tranches cover the work planned respectively on the A10PI207/5 + A10PS198/28 + A10PS209/7.

The missions are identical to those applied to the work of the firm tranche.

o Component 1: "project management mission"

In the works phase,

• VISA of execution studies

• Direction of the execution of the works (DET)

• Assistance for work acceptance operations (AOR)

• Scheduling, steering and coordination of the operation (OPC)

• Studies for loading test

• Follow-up of the perfect completion

o Part 2: "project management assistance mission"

In the works phase,

• Management of external controls (waterproofing, concrete, etc.)

• Accessibility of the works to the work – agreements – works phase

• Initial detailed inspection (IDI) after work

The exhaustive details of the missions are specified in the consultation file for companies. The market has day and night missions.

AMO/MOE for jacking and sealing work PI/PH A10 TC, A10 North and A11 (operation n°2)

The works concerned by operation 2 are:

the A10PI17BIS

the A10PI4/4

o A11PH703/9A

the A10PI105/4

The project management and project management assistance contract for lot n°2 includes one (1) firm tranche and three (3) optional tranches.

• The firm tranche covers the design studies of the entire program for the 4 bridges (A10PI17BIS + A10PI4/4 + A11PH703/9A + A10PI105/4) and work on the A10PI17BIS.

o Component 0: data recovery and validation multi-year program, definition of diagnostic needs and operational measures;

o Component 1: "project management mission"

In the study phase, for the entire operation program;

• Preliminary draft (AVP)

• ESCR Establishment, Operational Measures and Management Relations

• Project (PRO)

• Assistance in the award of Works Contracts (ACT)

• BIM

In the works phase, for the follow-up of the work on the A10PI17BIS;

• VISA of execution studies

• Direction of the execution of the works (DET)

• Assistance for work acceptance operations (AOR)

• Scheduling, steering and coordination of the operation (OPC)

• Studies for loading test

• Follow-up of the perfect completion

o Part 2: "project management assistance mission"

In the study phase, for the entire operation program for the 4 bridges;

• Management of missions of investigations and complementary studies (asbestos lead, PAH diagnostics, concrete etc.) including DESC for complementary in-situ interventions,

• Regulatory studies under the Water Act

• Accessibility of the work to the work – conventions – study phase

• Network management

In the works phase, for the follow-up of the work on the A10PI17BIS;

• Management of external controls (waterproofing, concrete, etc.)

• Accessibility of the works to the work – agreements – works phase

• Initial detailed inspection (IDI) after work

The 3 optional tranches cover the work planned respectively on the A10PI4/4 + A11PH703/9A + A10PI105/4.

The missions are identical to those applied to the work of the firm tranche.

o Component 1: "project management mission"

In the works phase,

• VISA of execution studies

• Direction of the execution of the works (DET)

• Assistance for work acceptance operations (AOR)

• Scheduling, steering and coordination of the operation (OPC)

• Studies for loading test

• Follow-up of the perfect completion

o Part 2: "project management assistance mission"

In the works phase,

• Management of external controls (waterproofing, concrete, etc.)

• Accessibility of the works to the work – agreements – works phase

• Initial detailed inspection (IDI) after work

The exhaustive details of the missions are specified in the consultation file. The market has day and night missions.

AMO/MOE for painting A10 Traversée de Tours sheet piles (operation n°3)

The multiannual programme of work breaks down as follows:

• Program 2026: walls A10MUR2121-11 + A10MUR2125-11

• Program 2027: walls A10MUR2121-24 + A10MUR2122-22

• Program 2028: walls A10MUR2088-11 + A10MUR2100-11.

The project management and project management assistance contract for operation 1 includes one (1) firm tranche and two (2) optional tranches.

• The firm tranche covers the design studies of the entire programme up to 2028 and the work planned for the programme in 2026.

o Component 0: data recovery and validation multi-year program, definition of diagnostic needs and operational measures;

o Component 1: "project management mission"

In the study phase, for the entire operation program;

• Preliminary draft (AVP)

• ESCR Establishment, Operational Measures and Management Relations

• Project (PRO)

• Assistance in the award of Works Contracts (ACT)

• BIM

In the works phase, for the follow-up of the 2026 operation program;

• VISA of execution studies

• Direction of the execution of the works (DET)

• Assistance for work acceptance operations (AOR)

• Scheduling, steering and coordination of the operation (OPC)

• Follow-up of the perfect completion

o Part 2: "project management assistance mission"

In the study phase, for the entire operation program;

• Management of missions of investigations and complementary studies (diagnostics of existing paints, diagnosis of anchor tie rods, asbestos lead PAH etc.) including DESC for complementary interventions in-situ,

• Accessibility of the work to the work – conventions – study phase

• Network management

In the works phase, for the follow-up of the 2026 operation program;

• Management of external controls (painting)

• Accessibility of the works to the work – agreements – works phase

• Initial detailed inspection (IDI) after work

The 2 optional tranches cover the work of the 2027 and 2028 programme respectively.

The missions are identical to those applied to the work of the firm tranche.

o Component 1: "project management mission"

In the works phase,

• VISA of execution studies

• Direction of the execution of the works (DET)

• Assistance for work acceptance operations (AOR)

• Scheduling, steering and coordination of the operation (OPC)

• Follow-up of the perfect completion

o Part 2: "project management assistance mission"

In the works phase,

• Management of external controls (painting)

• Accessibility of the works to the work – agreements – works phase

• Initial detailed inspection (IDI) after work

The exhaustive details of the missions are specified in the consultation file The contract includes day missions.

Download full details as .pdf
The Buyer:
COFIROUTE
CPV Code(s):
71311220 - Highways engineering services