The SWEG Südwestdeutsche Landesverkehrs-AG operates together with other companies in numerous regions of Baden-Württemberg regional rail passenger transport and regular bus services. The SWEG intends to award a contract for the replacement rail service on the Elz Valley Railway between Denzlingen and Elzach.
The tender comprises a total of 3 lots.
The SWEG reserves the right to change the requirements in the further course of the award procedure.
Rail replacement service Elzach - DenzlingenRail replacement traffic on the Elz Valley Railway between Elzach station and Denzlingen station in accordance with the description of services, timetable and schedule for lot 1 (Annex 2a).
Cycle 1 - Mon - Fri Cycle 2 - Mon - Fri Cycle 3 - Mon - Fri Cycle 4 - Mon - Fri Cycle 9 - Mon - Fri Cycle 1 - Sat Cycle 2 - Sat Cycle 3 - Sat Cycle 4 - Sat Cycle 1 - Sun Circulation 2 - Sun Circulation 3 - Sun.
The performance and quality standards formulated in the tender documents ("is", "must", "are", "has to", etc.) are minimum requirements and are binding for the bidder. The offer must fully meet all mandatory tender specifications. Offers that do not contain the required information and explanations can be excluded from the award procedure.
Rail replacement service Elzach - DenzlingenRail replacement traffic on the Elz Valley Railway between Elzach station and Denzlingen station in accordance with the description of services, timetable and schedule for lot 2 (Annex 2b).
Cycle 5 - Mon - Fri Cycle 6 - Mon - Fri Cycle 7 - Mon - Fri Cycle 8 - Mon - Fri Cycle 5 - Sat Cycle 6 - Sat Cycle 7 - Sat Cycle 5 - Sun Cycle 6 - Sun Cycle 7 - Sun.
The performance and quality standards formulated in the tender documents ("is", "must", "are", "has to", etc.) are minimum requirements and are binding for the bidder. The offer must fully meet all mandatory tender specifications. Offers that do not contain the required information and explanations can be excluded from the award procedure.
Rail replacement service Elzach - DenzlingenRail replacement traffic on the Elz Valley Railway between Elzach station and Denzlingen station in accordance with the service description, timetable and schedule for lot 3 (Annex 2c)
Cycle 10 - Mon - Fri Cycle 11 - Mon - Fri Cycle 12 - Mon - Fri Cycle 13 - Mon - Fri Cycle 8 - Sat Cycle 4 - Sun.
Note on Circulation 11:
If, due to the pandemic, only trips that only run on school days are omitted, this does not result in any change in remuneration. In this case, circulation 11 is remunerated in the same way as school holidays.
The performance and quality standards formulated in the tender documents ("is", "must", "are", "has to", etc.) are minimum requirements and are binding for the bidder. The offer must fully meet all mandatory tender specifications. Offers that do not contain the required information and explanations can be excluded from the award procedure.