Building project:
The Helmholtz Center Potsdam, German Research Center for Geosciences is planning to build a new GeoBioLab on the grounds of the Telegraphenberg in Potsdam. The outdoor facilities will be given new street / path areas made of infiltrable concrete paving. 18 bicycle parking spaces are planned, which, like the 4 + 20 parking spaces, are made of concrete paving with a lawn joint. The rainwater is infiltrated via a trench with a cistern. Concrete angle brackets for supporting the terrain, lawns and wooded areas are also planned around the building. The edge of the eaves receives a gravel strip.
Gardening and landscaping work VE 602 Extract of the areas to be worked:
- Working area: 4 910 m
- Soil excavation: 300 m
- Floor drain: 200 m
- existing Spread the floor: 864 m
- Rigol body: 137 pieces,
- Path area: 80 m
- Roads / parking space: 1 560 m
- borders: 883 m,
- angular support walls: 92.5 m,
- Enclosure: 156 m.