Excavation and laying of 950 m force main, 90 mm PE;
Delivery and installing an interceptor for sludge of 75 m3;
Excavation and levelling of 3 open infiltration basins, each of 600 m2.
Get our periodical newsletter about how sell more to the public sector and how to make the most of Tenderlake.