L 602, new building Rußheim - Huttenheim, bridge construction
BW 6816-557 Bridge over the Pfinzkanal:
630 m 3 Remove topsoil, store and reinstall later
700 m 3 Remove the gravel base layer, store it and reinstall later
2 480 m 3 Removing, storing, accommodating, and installing the road embankment and Pfinzdamm
1 400 m 2 Perform soil improvement
5 360 m 2 Create a planum
4,800 m 3 Supply, install, compact suitable building material for application areas
1 250 m 2 Scotch base layer 0/45, thickness 40 cm. Supply, install and compact material
630 m 2 Deliver sheet piling and install
190 m cast-in-place piles produce Ø 75 cm, length 6 - 10 m
Create 28 stakes heads Ø 75 cm
450 m 3 Produce reinforced concrete
235 m 3 Prepare prestressed concrete
Deliver 1 temporary bridge, install, dismantle
Deliver and install 96 m railing
Deliver and install 98 m safety barriers
380 m 2 Clean concrete substrate and prime with epoxy resin
330 m 2 Supply and install bitumen welding track
340 m 3 Asphalt support layer AC 32 TS, installation thickness 10.0 cm. Supply and install material
55 m 2 To make a way out of stones; Make 13.5 m of stairs to Riz Bösch 2
BW 6816-559 Bridge over the Landgraben:
115 m 3 Remove topsoil, store and reinstall later
620 m 3 Remove the gravel base layer, store it and reinstall later
1 180 m 3 Removing, storing, accommodating, and installing the road embankment and Pfinzdamm
500 m 2 Perform soil improvement
1 450 m 2 Create a planum
1730 m 3 Supply, install, compact suitable building material for application areas
320 m 2 Deliver sheet piling and install
90 m cast-in-place piles Ø 75 cm, length 6 - 10 m
Make 16 stakes heads Ø 75 cm
335 m 3 Produce reinforced concrete
Deliver 1 temporary bridge, install, dismantle
Deliver and install 60 m railing
Deliver and install 62 m safety barriers
200 m 2 Clean concrete substrate and prime with epoxy resin
170 m 2 Supply and install bitumen welding track
110 m 2 Mastic asphalt ceiling 0/11 S manufacture, thickness 3.5 cm. Supply and install material
30 m GA-gutter
100 m 2 Asphalt support layer AC 32 TS, installation thickness 10.0 cm. Supply and install material
Make 21 m stairs to Riz Bösch 2