Repair work on the Rhine bridge Emmerich
Streckensanierung
Bridge
Approx. 18,000 m² Renewal of the waterproofing and pavement in the roadway area and on the cycle paths/footpaths in the area of the river bridge on steel deck
Approx. 2,250 m² Renewal of the waterproofing and pavement in the road area and on the cycle paths/footpaths on a concrete surface
Renewing approx. 5,000 m² of surface course
Approx. 108 pcs Renewal of the bridge drains in the steel deck
Approx. 16 pcs Renewal of bridge drains in concrete
Approx. 1,900 m renewal of the railings
Approx. 350 m partial renewal of corrosion protection on railings
Approx. 45 m of corrosion protection work on the transition structures
Demolition of approx. 275 m³ of concrete
Production of approx. 300 m³ of concrete
Betoninstandsetzung (VAK & Betonschutzwall)
Renewal of the lighting inside the rope chambers
Approx. 27.5 m paving of a bituminous joint at VAK Emmerich
Approx. 850 m² Renewal of the OS-F coating
Road construction
ca. 2,400 m3 of earthworks
like. 3.600 m3 Frostschutzschicht (0/45)
ca. 2,000 m2 asphalt base course made of AC 32 T N
ca. 8,000 m2 asphalt base course made of AC 32 T S
ca. 15,500 m2 asphalt binder course made of AC 16 B SG
ca. 15,500 m2 asphalt surface course made of AC 11 D SP
CA. 4.700 m2 Asphaltdeckschicht aus AC 8 D N
Dismantle approx. 2,500 m of protective equipment
Dismantle approx. 1,800 m of protective equipment on the structure
Approx. 4,300 m of protective equipment
Dismantle approx. 100 m of transition structures
Approx. 100 m of transition structures
Ca. Dismantle 13 St Road Sign
Eel Dismantle 13 pcs set-up device
Ca. 13 St Installing traffic signs / signposts
Ca. 13 pcs erection of a device according to static and structural requirements
Ca. 12 pcs of foundation according to static requirements