Pipeline relaying works

Contract Value:
-
Notice Type:
Contract Notice
Published Date:
12 August 2022
Closing Date:
12 September 2022
Location(s):
DE80N Vorpommern-Greifswald (DE Germany/DEUTSCHLAND)
Description:
Development B-Plan 30/09 Industriepark Berlin-Szczecin Pasewalk 1st BA - Construction phase 4.1 Planned roads A (partially) + B incl. civil engineering development SW, ring closure TWL and ELT

The construction phase 4.1 includes the construction of the planned roads A (partially) and B as well as the completion of the drinking water and extinguishing water supply (extension of a drinking water transport pipeline DN 300 from the end of the network of municipal utilities in Pasewalk to the northern edge of the B plan area 30-09) of the B plan 30-09. Furthermore, the rainwater drainage in the planned roads must be continued and the waste water network as a whole must be implemented.

Traffic facilities:

Remove topsoil 7,200 m³, loosen and recycle soil or rock 11,000 m³, install delivery floor SE/Si 3,500 m³, pipe ditches up to DN 200 850 m, road drains deliver and install rectangle 35 pieces, rainwater treatment systems DWA-A 102 produce 8 pieces, produce antifreeze layer 3,200 m³ roadway - 850 m³ parking strip - 500 m³ walkway/cycle path, gravel base layer produce 7,000 m² roadway - 2,200 m² parking strip - 3,200 m² walk/cycle path, Produce asphalt base course AC 32 TS 7,000 m², asphalt base course AC 32 TN produce 2,800 m², asphalt binder layer AC 16 BS produce 7,000 m², asphalt surface course AC 11 DS produce 7,000 m², asphalt surface layer AC 5 DL produce 2,800 m², concrete surface for parking strips 2,200 m², produce 2-row gutter 2,000 m, produce high-board stones 1,600 m, produce round curbs 1,000 m, deep curbs produce 2,200 m, Tree plantings (linden, maple, ash) produce 24 pieces, shrubs (finger shrub, barberry, dwarf medlar) plant 1,230 pieces, ground covers plant 1,070 pieces, flower strips produce 1,100 m², street lights (light point height 7 m) produce 44 pieces, lay underground cables for street lighting 2,100 m;

Dirty water:

975 m DN200-250, 19 shafts (plastic) depth up to 4.50 m, 154 m HA line DN 150, 580 m wastewater pressure pipeline DN 80 (90 x 5.4), 580 m wastewater pressure pipeline DN 100 (125 x 7.4), 1 main pumping station double pumping station 7.0 kW, 2 pcs B/E valves;

Drinking water:

481 m supply line DN 80 open, 104 m supply line DN 300 open, 54 m supply line DN 200 open, 6 pieces extinguishing water hydrant, 4 pieces extinguishing water hydrant transfer;

Rainwater:

64 m channel DN 300, 156 m channel DN 500, 92 m channel DN 800, 76 m channel DN 900, 8 shafts (concrete) depth up to 5.0 m

Download full details as .pdf
The Buyer:
Stadt Pasewalk
CPV Code(s):
45231113 - Pipeline relaying works
45233121 - Main road construction works