The Intercity project shall plan the Ringerike Line where it is not yet developed, or is
being constructed between Oslo, Lillehammer, Halden and Skien, completed by 2030.
The Norwegian National Transport Plan 2014-2023 prepares for the Intercity stretches to Hamar,
Tønsberg and Seut near Fredrikstad are being completed by 2024.
The Ringerike Line shall be designed, planned and constructed as a modern
double — tracked railway between Sandvika (Jong) and Hønefoss. Included in
planning is also the European road 16 with two traffic lanes in each direction between Skaret and the Ve
crossing. The start of works is scheduled to 2019, with a subsequent completion preliminary scheduled to
to 2024. The zoning plan is implemented as a governmental plan.
The section between Heleglandsmoen and the Ve crossing is not yet determined.