Consistency of the work: Accessibility – waterproofing of the underpass – Repair of the continuous shelters
In compliance with the safety and regulatory requirements in force, this operation provides, in particular, for the execution studies and the completion of the following work, including the production of the bonding documents:
- the raising of all or part of the five (5) platforms, to medium-high platforms (55 cm) over the determined useful lengths,
- the installation of alerting devices (tiles and/or strips),
- the preliminary raising of the rooms and/or manholes on the quays,
- raising the stair access hoppers to the underpass,
- the replacement and upgrading of the high and low current equipment of the five (5) docks, including the installation of ducts,
- the upgrading of the equipment of the access stairs to the underpass (handrails, braille sleeves, stair nosing, risers, etc.), and the repair of the underpass (repainting of the ceilings, walls and undersides of the decks),
- repair and reinforcement of concrete and metal post legs (in interface with dock shelter repair work),
- Waterproofing of the underpass from the docks.
- total repair of the wharf shelters
The contract consists of a firm tranche comprising:
Accessibility – waterproofing of the underpass – Repair of the continuous shelters
In compliance with the safety and regulatory requirements in force, this operation provides, in particular, for the execution studies and the completion of the following work, including the production of the bonding documents:
- the raising of all or part of the five (5) platforms, to medium-high platforms (55 cm) over the determined useful lengths,
- the installation of alerting devices (tiles and/or strips),
- the preliminary raising of the rooms and/or manholes on the quays,
- raising the stair access hoppers to the underpass,
- the replacement and upgrading of the high and low current equipment of the five (5) docks, including the installation of ducts,
- the upgrading of the equipment of the access stairs to the underpass (handrails, braille sleeves, stair nosing, risers, etc.), and the repair of the underpass (repainting of the ceilings, walls and undersides of the decks),
- repair and reinforcement of concrete and metal post legs (in interface with dock shelter repair work),
- Waterproofing of the underpass from the docks.
- total repair of the wharf shelters