Engineering services | Tenderlake

Engineering services

Contract Value:
-
Notice Type:
Contract Notice
Published Date:
25 October 2023
Closing Date:
23 November 2023
Location(s):
FRL03 Alpes-Maritimes (FR FRANCE)
Description:
Project management mission relating to the renovation of the exterior fittings of the Palais des Festivals et des Congrès de Cannes - application phase

Project management mission relating to the renovation of the exterior fittings of the Palais des Festivals et des Congrès de Cannes. The description of the services and their technical specifications are indicated in the Cahier des Clauses Techniques Particulières (CCTP) and in the programme. The work to be carried out belongs to the category of building works: reuse/rehabilitation. The description of the works and their technical specifications are indicated in the programme of works. The share of the provisional financial envelope allocated to the works is 925,000 euros (excluding VAT). The work will be carried out on an occupied site. It should be noted that they will be carried out in parallel with the renovation work of the Ambassadors' Lounge (year 2025) and the renovation work of the front street from level -1 to level +5 (years 2025 - 2026 - 2027). The entire establishment is classified as ERP type t, l, n, p, w, pa Category: 1st

This contract is awarded in accordance with a procedure with negotiation. It is subject to the provisions of Articles L.2124-3, R. 2124-1, R. 2124-3-3°, and R. 2161-12 to R. 2161-20 of the French Public Procurement Code. This procedure is used because the contract includes design services. This procedure takes place in two main phases: 1. An application phase at the end of which the candidates will be selected who will be admitted to submit a tender; Successful candidates following this selection stage will receive a consultation letter inviting them to submit their offer. The purpose of the information provided in the Business Consultation File (RFP) "application phase" is to enable economic operators to determine the nature and scope of the contract and to position themselves to participate in the procedure.2. A phase of choosing the most economically advantageous offer, from among the offers submitted by the pre-selected candidates. Negotiations may be initiated in advance under the conditions laid down in the consultation regulations. The work to be carried out belongs to the category of building works: reuse/rehabilitation. The description of the works and their technical specifications are indicated in the programme of works. The share of the provisional financial envelope allocated to the works is 925,000 euros (excluding VAT). The execution of the works is planned in phases, mainly during the summer season, starting in 2026 (including the preparation period for the first phase of works) and up to and including 2028. The work will be carried out on an occupied site. It should be noted that they will be carried out in parallel with the renovation work of the Ambassadors' Lounge (year 2025) and the renovation work of the front street from level -1 to level +5 (years 2025 - 2026 - 2027). The entire establishment is classified as ERP type t, l, n, p, w, pa Category: 1stThe elements of the project management mission included in the framework of the contract concern the basic mission within the meaning of Article R2431-1 of the Public Procurement Code, i.e. - diag / diagnosis- aps / preliminary draft summary, - apd / final preliminary project,- pro / project studies,- ACT / Assistance to the Contracting Authority for the award of works contracts, including the drafting of the tender documents for the contractors, - Endorsement / Endorsement of the execution studies carried out by the Works Contractors;- DET / Management of the execution of the Works,- AOR / Assistance provided to the Contracting Authority during the acceptance operations and during the guarantee of perfect completion. The content of each mission element is that provided for in Articles R. 2431-19 to R. 2431-23 (project management mission elements for reuse or rehabilitation operations of building structures). As an indication, the estimated date of notification of the contract and, therefore, of the start of the studies, is January 2024.La estimated overall duration of the performance of the project management contract shall begin on the date of notification of this contract, until the expiry of the guarantee of perfect completion of the works contract(s) or after extension of this period if the reservations indicated at the time of acceptance are not all lifted at the end of this contract. period. In this case, the mission is completed when the reservation is last lifted. The maximum deadlines for the execution of the various mission elements are set out in the deed of commitment

Download full details as .pdf
The Buyer:
s.e.m.e.c
CPV Code(s):
71300000 - Engineering services