The works concern the resurfacing of the surface course and possibly the connecting layers of the Saint Quentin Fallavier BPV platform, including the car parks and adjoining ramps in the direction of Chambéry / Lyon
As an indication, the works concern in particular:-Planing: 44,000 m2,-Removal of asbestos asphalt in two localized areas: 1,660 T,-Supply and installation of GB4 asphalt, BBSG link and BBSG bearing: 7,500 T.