With the purchase of the former municipal school building by the city in 2016, the opportunity arises to develop the site of the listed former cloister wing of the Franciscan monastery from the 13th century and the school building from the 19th century into a place for culture and education. The building, which was used from 1995 to 2016 as the administration building of the Allgemeine Ortskrankenkasse (AOK), takes over the infrastructure necessary for the exam wing. As a result, the intervention in the listed substance can be minimized. It also enables barrier-free access to the upper floor of the cloister wing, also connected to the old school. The new connecting building between the new library and the old cloister building traces the course of the former apse.
As a replacement for the demolished part of the building from the 1980s, a new extension in conventional masonry with concrete ceilings will be built in the same width, but adapted to the length of the former schoolhouse.
Extended shell
contents
- Gutting of the old school building
- Securing of the outer walls, roof and ceiling constructions of the old school building as steel construction towers
- Masonry in existing buildings and as new construction services
- Concrete and reinforced concrete work in existing buildings and as new construction services
- Interior and exterior plastering work
- Screed work incl. insulation under the screed
Hauptleistungen
- Masonry in existing buildings approx. 20 m³
- Masonry as a new building approx. 100 m³
- Masonry in a single monument approx. 20 m³
- Concrete C20/25 div. Fundamentals as. 35 m³
- Concrete C30/37 level approx. 85 m³
- Concrete C30/37 ceiling beams ring anchor approx. 160 m³
- Concrete C35/45 Köcherfundamente ca. 30 m³
- Interior insulation approx. 950 m²
- Interior / exterior plaster approx. 500 / 525 m²
- Screed and insulation approx. 980 m²