Construction work for pipelines and roads.
Civil engineering and green space office:
- about 7 000 m
- about 3 500 m
- about 350 m
- about 400 m
Lippeverband:
165 m MW-channel, concrete pipe DN 1000 - DN 1200,
- approx. 300 m MW-channel, concrete pipes DN 700 - DN 900,
- approx. 1 260 m MW channel and transport line drain channel, PE pipes DA 180 to DA 560,
- approx. 860 m drainage channel, PVC pipes DN 250,
- approx. 720 m sewer connection pipes, PP pipes DN 150,
- about 39 pieces of standard shaft structures,
- 2 pieces of shotcrete pits,
- 2 pieces of special structures.