Dismantling of the existing asphalt concrete revetments and restoration of the revetments in asphalt concrete construction at the main and secondary dam of the Seebach Dam
Nebendamm
+ Dismantling of the waterside asphalt concrete revetment consisting of bedding binder and asphalt concrete protective layer including flexobit layer (approx. 6,900 m²) and material disposal (approx. 2,750 t)
+ Ballast of the waterside embankment incl. the change of the inclination and improvement of the flatness (approx. 6,900 m²) as well as the escape of the water level line
+ New construction of the water-side asphalt concrete protection layer (approx. 6,900 m²) consisting of bedding binder, drainage layer and protective layer (mastic) including the lateral connections
+ Dismantling of Kronenstraße (approx. 2,000 m²) and material disposal (approx. 2,750 t)
+ Rehabilitation of kronenstraße in asphalt concrete construction including the left and right flanks
Hauptdamm
+ Dismantling of the waterside asphalt concrete revetment consisting of bedding binder and asphalt concrete protective layer including flexobit layer and material disposal (approx. 13,000 m²) and material disposal (approx. 6,500 t)
+ Improvement of the flatness of the dismantling or new construction area as well as the escape of the water level line (approx. 13,000 m²)
+ New construction of the waterside asphalt concrete protection layer (13,000 m²) consisting of bedding binder, drainage layer and protective layer (mastic) including the lateral connections and connections to solid structures
+ Dismantling of Kronenstraße (approx. 2,100 m²) and material disposal (approx. 350 t)
+ Rehabilitation of kronenstraße in asphalt concrete construction including the left and right flanks
Others
+ Construction site equipment including cleaning of the access roads
+ Increase of the wheel walls at the beginning of the firing channel (length approx. 16 m) of the flood relief system
+ Production of 21 measuring pillars for vertical displacement measurement (elevation points)