The construction project includes the renewal of the asphalt deck and asphalt binder layer over a total length of 6.4 km and the entire road width of both directions of travel, as well as the production of a steadfast banquet in the middle strip.
Road safety measures for ceilingless renewal D100 section 1:
7.5 km traffic routing 3s+1 or 1+3s.