On the school grounds of Pater-Wilhelm-Fink-Strasse 18, an extension is to be built with a connecting corridor to the existing building: Acoustic expansion trade DIN 18340, 18355, 18357. Execution period: KW 14/2021-KW 30/2021.
The primary and middle school of Rottenburg ad Laaber is located at Pater-Wilhelm-Fink Straße 18. An extension to the school is to be built on the associated school playground. A connecting corridor should also be created between the existing and the new building. The following approximate information is relevant for the measure:
- 1,500 linear meters of acoustic ceiling baffles,
- 250 m
- 30 m
- 150 m HPL reveal panels.