Production of outdoor facilities with parking spaces
Equipping and opening up outdoor facilities with parking spaces:
- produce 20,700 square meters of rough plan;
- supply and lay 5,100 square meters of concrete paving;
- produce 3,380 sqm of paved areas for pitches and driveways;
- make and fill 800 m trenches for electrical and drainage pipelines;
- Produce 3,680 sqm of plastic sports field surfaces;
- produce 4,400 sqm of lawn;
- 45 pcs supply and install trees with irrigation system;
- 38 pcs supply and plant large shrubs;
- 40 pcs supply and plant solitary shrubs;
- 3,160 pcs. supply and plant hedges, shrubs and roses;
- 3,570 pcs. supply and plant perennials and grasses;
- 50 pcs supply and plant flower bulbs;
- supply, install and install 198 m ball fence;
- Supply, install and install 550 m double-rod mesh fence;
- 10 pcs supply, install and install swing doors and gates;
- various equipment (bicycle roofs, basketball, small-field soccer and volleyball facilities, benches and tables, seating areas and blocks, pergola and raised bed borders)