The Bad Kreuznach wastewater disposal facility (client AG or ABW for short) intends to convert the Ebernburg sewage treatment plant (with approx. 9500 EW) into a wastewater pumping station with a new construction of a pressure pipe (approx. 1380m) for connection to the ABW sewer network.
The needs assessment is complete. For details of the action, refer to the SOW, which is available for download.
The planning services required for the measure are to be awarded in 3 lots: lot 1 object planning services for the engineering structures and the planning services of mechanical equipment, lot 2 planning services for technical equipment electrical and electronic MSR technology and lot 3 services of structural engineering.
The subject of this announcement is Lot 2 planning services of technical equipment electrical and e-MSR technology.
The subject of this announcement is Lot 2 planning services of technical equipment electrical and e-MSR technology. Within the meaning of HOAI, the scope of processing includes: § 55 Technical Equipment Electrical and E-MSR Technology § 1-9 HOAI (of which LP 7 partly).
The anticipated eligible costs are
E-technology/E MSR technology
KG 440 100.000 EUR
KG 480 30.000 EUR
The approval planning is to be created by the end of May 2022. A structural realization of the measure is planned in 2023.