The new construction of the Rebstockbad in Frankfurt am Main is the most important swimming pool project within the framework of the Frankfurt 2025 swimming pool concept and, in addition to its function for the regional supply of the city of Frankfurt am Main, aims to have a supra-regional impact on the Rhine-Main region. The Rebstockbad is to become a showcase project in the bathing landscape. The wide-ranging needs of a visit to the pool, from sporting aspects to leisure activities with family and friends to health and wellness-oriented offers - should be reflected in the profile of the new Rebstockbad. In addition to the external impact of the building, the primary goal of the project is to make the bathroom attractive to future users. Other central project goals are the energy- and resource-saving, ecological and economical construction and operation of the Rebstockbad. This is to be ensured by an efficient, durable, sustainable, low-maintenance and easy-care design. The services tendered here are heating technology.
Aufzugsanlagen_
- Elevator TRH 1: 1000kg/13 people, 7 stops
- Elevator TRH 2: 630kg/8 people, 5 stops
- Elevator forecourt: 630kg/8 persons, 2 stops
- Sauna lift: 630kg/8 people, 2 stops
- Food/small goods elevator, 2 stops
Hubbühne:
- Lifting platform up to 5m
- 3000kg load capacity
- Platform 1.0 x 1.5m
- powder-coated