The ISP information focus includes the automation station / DDC
for the building and is used to control and regulate the technical
Installations in the building (heating, ventilation, plumbing). The ISP is located in the building in the
Ground floor, room technology/electrical/I&C installed. The ISP is provided via a
Network connection (fiber optic cable) to the operating PC in the building
Realschule II.
Quantities:
-Delivery and installation control cabinet 1 pc.
-Delivery and assembly of field devices approx. 25 pcs.
-Delivery and installation DDC devices approx. 30 pcs.
-Project planning of physical data points approx. 128 pcs.
-Communicative data points approx. 150 pcs.
-Creation of WEB images approx. 12 pcs.
-Create dynamic overlays approx. 420 pcs.
-Deliver and set up software for existing operating PC