The technical description of the service is included in Chapter III of these special specifications. The contract is divided into 8 lots:
- Lot 1 “Study assignment to disconnect and redesign the Laarderweg and Panhovenstraat”
- Lot 2 “Study assignment to disconnect and redesign the Wittesteenstraat”
- Lot 3 “Study assignment to disconnect and redesign the Bokterstraat”
- Lot 4 “Study assignment for the implementation of the Grote-Brogel master plan in particular the relocation of the Smeetshofweg”
- Lot 5 “Study assignment to redesign Pol Kip and Oudestraat as mobipoint”
- Lot 6 “Study assignment to disconnect and redesign the Burgemeester Voetslaan”.
Lot 1 “Study assignment to disconnect and redesign the Laarderweg and Panhovenstraat”Drawing up technical design for the redesign of roadways. See chapter III, technical description of the contract.
Lot 2 “Study assignment to disconnect and redesign the Wittesteenstraat”Drawing up technical design for the redesign of roadways. See chapter III, technical description of the contract.
- Lot 3 “Study assignment to disconnect and redesign the Bokterstraat”Drawing up technical design for the redesign of roadways. See chapter III, technical description of the contract.
Lot 4 “Study assignment for the implementation of the Grote-Brogel master plan, especially the relocation of the Smeetshofweg”Drawing up technical design for the redesign of roadways. See chapter III, technical description of the contract.
- Lot 5 “Study assignment to redesign Pol Kip and Oudestraat as mobipoint”Drawing up technical design for the redesign of roadways. See chapter III, technical description of the contract.
- Lot 6 “Study assignment to disconnect and redesign the Burgemeester Voetslaan”.Drawing up technical design for the redesign of roadways. See chapter III, technical description of the contract.