The project includes the construction of a college with a capacity of 750 students and associated outdoor spaces. The whole of this construction developing a floor area of approximately 5,678 m
The amount of the provisional envelope allocated to the work (new building + demolition + VRD) is set by the contracting authority at EUR 11,160,000 excluding tax, value September 2020.
Demolition - asbestos removalDemolition - asbestos removal.
Dubbing partitionsThe works covered by this lot consist of: the realization of thermal linings, counter-partitions against the timber frame walls, distribution partitions, technical ducts, dry screeds, plaster ceilings, various works and accessories .
False ceilings- interior suspended ceilings,
- exterior false ceilings, excluding plasterboard ceilings.
Flooring- flexible floors: linoleum flooring, PVC flooring in the stairs;
- hard floors: acoustic screeds, glued floor coverings, earthenware wall coverings.
Painting- interior painting works,
- varnish on wood works,
- commissioning cleanings.
Heating - ventilation - sanitary plumbing - bench- production of heating by wood pellet boiler,
- centralized semi-instantaneous DHW production,
- building heating installation by radiators, radiant panels, underfloor heating and air heater,
- ventilation installations,
- technical management of the building.
Strong currents - weak currents - SSIDistribution of electricity, computer signals, telephone. Fire alarm, anti-intrusion, access control and time distribution systems. Lighting of the premises.
ElevatorThe manufacture, supply, transport of the elevator.
Kitchen equipmentSupply of all the equipment intended for the installation of an educational kitchen for the Hygiene Food Services section (HAS) made up of two groups of eight students per level.
Educational greenhousesSupply and installation of two educational greenhouses.
signageIndoor and outdoor signage for buildings.
VRD - earthworks - exterior fittings- site preparation,
- general earthworks,
- the trenches and backfilling for all the networks in this file,
- trenches, plinths, beds, plinths and ridges for concessionary networks,
- masonry and various works,
- the construction of tracks, and circulations,
- green spaces,
- outdoor furniture, fences and gates.
Big work- earthworks for underground structures,
- platform adjustment and additional stonework,
- foundation works,
- large concrete and foundation pit,
- reinforced concrete structures,
- interior plasters - screeds,
- thermal and acoustic insulation.
Timber frame walls - timber frameMOB and timber frame works, circular posts, rectangular posts, timber frame wall.
Roof waterproofing - zinc cladding- TPO waterproofing inaccessible under vegetation;
- TPO waterproofing accessible under slab-on-pedestal protection;
- inaccessible self-protected TPO waterproofing on a steel deck support;
- skylights, roofing structures and zinc standing seam cladding;
- zinc cladding;
- translucent panels.
Wooden facade- wood siding,
- framework, rock wool insulation,
- rock wool insulation,
- fiber-cement cladding,
- air knife deflector and shutter,
- wooden fence.
Exterior joinery - solar protection- aluminum exterior joinery work,
- crutching,
- interior sun protection blinds,
- electric sun shades,
- roller shutters.
Locksmith- metal doors of technical and storage rooms in general,
- barred fences and gates,
- the railings and handrails of the stairs,
- glazed guardrails in protection against the vacuum.
Interior joineryInterior woodwork, hardware.