Other electrical installation work | Tenderlake

Other electrical installation work

Contract Value:
EUR 525K - 525K
Notice Type:
Contract Notice
Published Date:
11 August 2023
Closing Date:
07 September 2023
Location(s):
DEF07 Nordfriesland (DE Germany/DEUTSCHLAND)
Description:
OR-Anbau Niebüll, VE 12 Gebäudeautomation, 32300175OV

At the hospital in Niebüll, a new building is being erected for an MRI and two operating theatres. For the new building, the building automation (BA) is described in the following specifications. This is made up of a total of 3 automation focal points (ASP). The ASP 01.21 is being erected to control and regulate heat generation in existing buildings. The ASP 01.11 is planned in the basement of the new building and supplies the HVAC systems, the heat distribution, the cooling generation and distribution. In addition, there are interfaces to plumbing, electrical, telecommunications technology and elevator technology. The ASP 00.11 takes over the tasks of individual room control and is to be installed in the technical room on the ground floor. The ASP's are equipped with a touch panel in the front for operation. At the present time, the ASPs are to be built and put into operation. It is operated via the touch panels. At the end, one EDE file for each automation device must be handed over to the client with the documentation.

building automation

At the hospital in Niebüll, a new building is being erected for an MRI and two operating theatres. For the new building, the building automation (BA) is described in the following specifications. This is made up of a total of 3 automation focal points (ASP). The ASP 01.21 is being erected to control and regulate heat generation in existing buildings. The ASP 01.11 is planned in the basement of the new building and supplies the HVAC systems, the heat distribution, the cooling generation and distribution. In addition, there are interfaces to plumbing, electrical, telecommunications technology and elevator technology. The ASP 00.11 takes over the tasks of individual room control and is to be installed in the technical room on the ground floor. The ASP's are equipped with a touch panel in the front for operation. At the present time, the ASPs are to be built and put into operation. It is operated via the touch panels. At the end, one EDE file for each automation device must be handed over to the client with the documentation. A connection to a management and operating device (MBE) is included in the tender, but cannot be carried out at the present time. A new MBE from the manufacturer DEOS is currently being installed at the Niebüll site, which should be ready for operation by the end of 2023. The connection is then to be carried out by the contractor of the GA.

Download full details as .pdf
The Buyer:
Klinikum Nordfriesland gGmbH
CPV Code(s):
45317000 - Other electrical installation work