The HPA operates a silt dump at the Francop site. Partially dewatered, contaminated dredged material from the water depth restoration in the Port of Hamburg was continuously used as a seal at this landfill site or stored for unsuitable material for sealing construction. The basis for the operation of the landfill Francop are the approvals in the course of approval proceedings acc. §62 HaBauO from the years 1991 and 1998. The landfill was duly transferred into the regime of waste legislation according to Kreislaufwirtschaft and Waste Act and with the entry into force of the Landfill Ordinance in 2003. The landfill has an area of approximately 95 ha. The storage of dredged material was completed in the summer of 2018. In this former storage area in the east of the landfill, section Hintzenort, the cover system is now to be finally produced in compliance with the operating conditions granted by the supervisory authority.
Dismantling, transporting and storing the temporary sand cover of the root barrier on an area of approx. 70 000 m
- Installation of approx. 80 000 m
- dismantling and disposal of approx. 5 350 m
- dismantling of approx. 3 000 m
- dismantling, transport and unloading of approx. 9 200 m³ sand of the sand dam of the landfill access incl. Expansion and disposal of 10 700 m
- dismantling, transport and unloading of approx. 5 000 m
- Preparation of a methane oxidation window on an area of 2 400 m
- Delivery and installation of the fence with a length of approx. 170 m and the gate system for the methane oxidation window,
- Loading, transporting and piling up 62 750 m
- Loading of external transport vehicles with 21 000 tonnes of silt from METHA.