New construction of shore power systems with delivery, installation and connection of the
central components; cabling between the public utilities connection and the
shore power systems, as well as the junction boxes in the quay area.
New construction of shore power systems with 16 MW according to IEC 80005-1 standard in Kiel's eastern shore port for simultaneous shore power supply to cruise ships at berth 1 and RoRo ferries at berths 5 to 8. A shore power supply at berth 9 is to be planned as an extension option, for later execution if necessary. Equipping the shore power system with central components (input switchgear, transformers, frequency converters, output switchgear, control and monitoring system), compact station with MS switchgear and cable routing between the shore connection system and the quay system (junction boxes, transfer equipment), as well as the connection point of the municipal utilities. Commissioning the entire system, including junction boxes and handoff technology. Plan and carry out civil engineering work (cable route laying) and hydraulic engineering work (piling work, steel construction work, hydraulic steel construction). Preparation of draft/approval planning based on preliminary planning. obtaining the building permit. Preparation of execution planning.