Parts of central-heating radiators

Contract Value:
EUR 629K - 629K
Notice Type:
Contract Notice
Published Date:
08 May 2023
Closing Date:
22 May 2023
Location(s):
DEA1A Wuppertal, Kreisfreie Stadt (DE Germany/DEUTSCHLAND)
Description:
Supply and replacement of radiator valves "HEATING"

The aim of the award procedure to be carried out is (the procurement) the replacement of radiator valves in order to be able to carry out the hydraulic balancing and to save additional thermal energy, which otherwise cannot be implemented by the old radiator valves and thermostatic heads, especially in the old buildings.

The basis is the Ordinance on the Security of Energy Supply on Short-Term Effective Measures, the EnSikuMaV, which came into force by the Federal Government on 01.09.2022

The implementation of this measure is carried out within the framework of the Quick-Win Package Sustainability, which is financed by BLB NRW.

The procedure is carried out by the BUW for the BLB.

The implementation of the measure can be carried out only in the non-heating period - in the months of July, August and September.

BUW reserves the right to award the contract if the required clearance work is not awarded in procedure EU23105-6 of the overall measure.

Campus Grifflenberg - Building B, BZ, HI, I, K, MI, O, P, S, T

The heating circuits will be emptied by the Sanitary/Heating Department of Dec. 5 Building Management of BUW before work begins.

The areas in front of the radiators are previously made accessible by an external moving company.

The adjustment of the thermostatic valve with automatic flow control, as well as delivery and installation of the thermostats, is also carried out by the Sanitary/Heating Department of Dec. 5 Building Management of the BUW.

This must also be informed before filling the system in order to ensure the replenishment of the heating water.

Campus Grifflenberg - Buildings D, F, G, L, M and N

The heating circuits will be emptied by the Sanitary/Heating Department of Dec. 5 Building Management of BUW before work begins.

The areas in front of the radiators are previously made accessible by an external moving company.

The adjustment of the thermostatic valve with automatic flow control, as well as delivery and installation of the thermostats, is also carried out by the Sanitary/Heating Department of Dec. 5 Building Management of the BUW.

This must also be informed before filling the system in order to ensure the replenishment of the heating water.

Campus Freudenberg - Gebäude FBZ, FC, FD, FE, FG, FK, FM, FME

The heating circuits will be emptied by the building management RGM Facility Management GmbH before the start of the work.

The areas in front of the radiators are previously made accessible by an external moving company.

The adjustment of the thermostatic valve with automatic flow control, as well as delivery and installation of the thermostats, is also carried out by the Sanitary/Heating Department of Dec. 5 Building Management of the BUW

and Gebäudemanagement RGM Facility Management GmbH.

This must also be informed before filling the system in order to ensure the replenishment of the heating water.

Campus Haspel - Buildings HB, HD, HE and HF

The heating circuits will be emptied by the building management RGM Facility Management GmbH before the start of the work.

The areas in front of the radiators are previously made accessible by an external moving company.

The adjustment of the thermostatic valve with automatic flow control, as well as supply and assemble the

Thermostats are also provided by the sanitary/heating department of Dec. 5 Building Management of BUW and the building management RGM Facility Management GmbH.

This must also be informed before filling the system in order to ensure the

To ensure replenishment of the heating water.