In order to cover the demand for natural gas for SLP and RLM acceptance points, defined in one lot, the city of Fürstenwalde/Spree needs a new gas supply contract for the period from 01.01.2023 to 31.12.2023. The present procedure serves to determine this contractor.
In order to cover the demand for natural gas for SLP and RLM acceptance points, defined in one lot, the city of Fürstenwalde/Spree needs a new gas supply contract for the period from 01.01.2023 to 31.12.2023. The present procedure serves to determine this contractor. The lot thus comprises a total of 17 delivery points with approx. 7.9 GWh of gas per year. Divided into 16 non-performance-measured delivery points and 1 performance-measured delivery point.