Services according to VOB/A for KG 480: Building automation (MSR)
At the existing building complex HyFaB (Research Factory for Fuel Cell Technology - HyFaB1 and HyFaB2) in Ulm, Lise-Meitner-Str. 24, the project "Powder-Up! – Development, scale-up and production of competitive cathode materials for lithium-ion batteries" another building finger will be designed. The pilot plant planned within the project, an analysis laboratory and systems for rapid electrochemical validation are to be implemented.
The Powder-Up! - Gebäudefinger will also include the basic technical installations necessary for the further expansion of the Lise-Meitner-Straße site. The basement building accommodates the pilot plant on the ground floor (powder part) and on the first floor (precipitation part). Analytics will be housed on the second floor and electrochemistry on the third floor. The basement contains the rear connections to the existing HyFaB energy center, the necessary building infrastructure for chemical operation and a measuring room for vibration-sensitive measuring devices, which are used as part of Powder-Up! can be purchased. In the basement, the supply infrastructure for a possible third and fourth building finger is also being prepared.
Within the framework of these tenders, services for KG 480 (I&C technology) are required:
1.1 SWITCHGEAR ISP100/300/400
1.2. AUTOMATION (ISP100 / ISP300/400)
1.3. FELDGERÄTE
1.4. INSTALLATIONSGERÄTE
1.5. VERLEGESYSTEME ENDVERLEGUNG
1.6. CONNECTIONS TO ON-SITE MACHINERY AND EQUIPMENT
1.7. MISCELLANEOUS
1.8. MAINTENANCE
1.9. INTEGRATION OF BUILDING MANAGEMENT SYSTEMS
Further details can be found in the tender documents.