New construction of a sports hall at the Berufskolleg Bocholt West
Locksmith work:
Ca. 50 m Edelstahlhandläufe
Approx. 40 m barrier made of steel, primed and finished painted at the grandstand aisle
Approx. 30 stainless steel brackets on the side of the grandstand
Approx. 50 m all-glass railing as fall protection at the grandstand
Approx. 10 m galvanized stair railing
Locksmith work:
Ca. 50 m Edelstahlhandläufe
Approx. 40 m barrier made of steel, primed and finished painted at the grandstand aisle
Approx. 30 stainless steel brackets on the side of the grandstand
Approx. 50 m all-glass railing as fall protection at the grandstand
Approx. 10 m galvanized stair railing