Elektroinstallationsarbeiten - Baustrom
For the construction project, construction power and
Construction site lighting needed. All products must be procured new and offered as such.
After completion of the construction project, the products become the property of the client.
For the two buildings, a total of
• 1 Gruppenverteiler 250A
• 2 Baustromverteiler 100A
• 8 Baustromverteiler 63A
• 10 construction site power distributors 63A, with 1 timer
• 2 construction site power distributors 63A, with 2 timers
• 120 lights
• 16 motion detectors
• 200m rubber hose lines cross-section 1,5mm²
• 1300m rubber hose lines cross-section 2,5mm²
• 320m rubber hose lines cross section 25mm²
• 190m rubber hose lines cross section 35mm²
• 340m rubber hose lines cross section 50mm²
• 10m rubber hose lines cross section 95mm²
• 520m NYY-J 1x16mm²
needed.