Description:
Painting and varnishing work, new UHZ building

The painting and varnishing work includes the following services:

1. Own construction site equipment, sample areas, protection of components, and object management,

2. Painting and varnishing work

-83,690 m2 initial coatings with emulsion paint NA1 +2, incl. substrate pre-treatment on walls made of masonry, concrete and GK building boards, incl. 7,510 m2 fillers concrete walls, Q3, full-surface, in 6 colours: RAL 9003, RAL 9001, 4 different NCS colours, medium tinted

-69,850 m2 of glass fleece without structure on walls made of GK building boards

-225 m transparent glaze on round concrete columns incl. substrate pre-treatment

-120 m2 Initial coating with emulsion paint NA2, incl. substrate pre-treatment and filling on concrete ceilings, in 2 colours: RAL 9003 and 1 NCS colour, medium tinted

-4,178 m2 Initial coating with emulsion paint NA1 +2, incl. substrate pre-treatment on ceilings made of perforated GK panels, in 5 colours: RAL 9003 and 3 different NCS colours, medium tinted

-3,289 m2 initial coating with emulsion paint NA2, incl. substrate pre-treatment on ceiling friezes made of GK panels, in 2 colours: RAL 9003 and 1 NCS colour, medium tinted

-18,295 m2 Initial coating with emulsion paint NA1 +2, incl. substrate pre-treatment on ceilings made of GK boards, in 4 colours: RAL 9003 and 3 different NCS colours, medium tinted

-1,285 m2 Initial coating with emulsion paint NA2, incl. substrate pre-treatment on ceiling case made of GK panels, in 1 colour: RAL 9003

-395 m Initial coatings with emulsion paint NA1 +2, incl. substrate pre-treatment and fillers Concrete reveals, Q3, over the entire surface of concrete reveals, in RAL 9003,

-9220 m Steel frames coated with alkyd resin

-348 pcs 1- and 2-flgl. Sheet steel doors with frames coated with alkyd resin

-12 pcs protective sliding gates coated with alkyd resin

-1935 m handrails + 668 m stair railings +218 m2 stairs made of steel coated with alkyd resin

The painting and varnishing work includes the following services:

1. Own construction site equipment, sample areas, protection of components, and object management,

2. Painting and varnishing work

-83,690 m2 initial coatings with emulsion paint NA1 +2, incl. substrate pre-treatment on walls made of masonry, concrete and GK building boards, incl. 7,510 m2 fillers concrete walls, Q3, full-surface, in 6 colours: RAL 9003, RAL 9001, 4 different NCS colours, medium tinted

-69,850 m2 of glass fleece without structure on walls made of GK building boards

-225 m transparent glaze on round concrete columns incl. substrate pre-treatment

-120 m2 Initial coating with emulsion paint NA2, incl. substrate pre-treatment and filling on concrete ceilings, in 2 colours: RAL 9003 and 1 NCS colour, medium tinted

-4,178 m2 Initial coating with emulsion paint NA1 +2, incl. substrate pre-treatment on ceilings made of perforated GK panels, in 5 colours: RAL 9003 and 3 different NCS colours, medium tinted

-3,289 m2 initial coating with emulsion paint NA2, incl. substrate pre-treatment on ceiling friezes made of GK panels, in 2 colours: RAL 9003 and 1 NCS colour, medium tinted

-18,295 m2 Initial coating with emulsion paint NA1 +2, incl. substrate pre-treatment on ceilings made of GK boards, in 4 colours: RAL 9003 and 3 different NCS colours, medium tinted

-1,285 m2 Initial coating with emulsion paint NA2, incl. substrate pre-treatment on ceiling case made of GK panels, in 1 colour: RAL 9003

-395 m Initial coatings with emulsion paint NA1 +2, incl. substrate pre-treatment and fillers Concrete reveals, Q3, over the entire surface of concrete reveals, in RAL 9003,

-9220 m Steel frames coated with alkyd resin

-348 pcs 1- and 2-flgl. Sheet steel doors with frames coated with alkyd resin

-12 pcs protective sliding gates coated with alkyd resin

-1935 m handrails + 668 m stair railings +218 m2 stairs made of steel coated with alkyd resin