B58 old, Wesel-Büderich, dismantling of a former construction site equipment area and partial dismantling of roadway B58 old
The advertised services essentially include:
pick up and dispose of approx. 440 m3 of topsoil from banquets, dividing strips, cycle path edges, (of which approx. 280 m³ can be picked up with suction excavator in root areas),
install approx. 4,000 m³ topsoil of the AG,
cut approx. 1,100 m³ of asphalt,
approx. 16,500 m² asphalt milling,
approx. 480 m³ asphalt pavement,
pick up and dispose of approx. 540 m³ of pitched road pavement,
absorb and dispose of approx. 1,400 m³ layers without binder,
absorb approx. 900 m³ layers without binder,
produce approx. 340 m³ frost protection layer,
approx. 320 m curb,
accommodate approx. 310 m paving channels,
accommodate approx. 200 m of safety barriers,
produce approx. 1,800 m of road marking (High Solid colour).