Ketteler Hospital OF - Extension of functional building - extension of nursing extension
Lot 1 shell work
Lot 2 scaffolding work
Lot 3 Aluminium windows / sun protection
The 4a Stahlbauarbeiten
The 4b Metallbauarbeiten
The 5 Dachabdichtungsarbeiten
Lot 6 ETICS
Lot 1 shell workConstruction site equipment, dismantling with concrete cutting work, shell construction work with precast concrete elements and in-situ concrete as well as masonry work.
Lot 2 scaffolding workScaffolding of an existing two-storey building and scaffolding of a further three floors (approx. 2900m² in total).
Lot 3 Window construction work / sun protectionAluminium windows, escape doors and sun protection with venetian blind boxes
The 4a StahlbauarbeitenLoad-bearing steel structure of the extended technical centre with thermally insulated steel cassette wall cladding and an escape staircase tower
The 4b MetallbauarbeitenLocksmith work for grating steps, railings with handrails inside and outside as well as exterior doors
The 5 DachabdichtungsarbeitenDemolition of approx. 1100 m² roof cladding incl. insulation on existing flat roof as well as roof waterproofing work with bitumen sheets on concrete and trapezoidal sheet metal roof incl. mineral wool insulation
Lot 6 ETICSAddition to the existing thermal insulation composite system on the existing building by approx. 1100 m² ETICS in the area of the storey