Cracking and control of Helms Crassula in the CIS basin 21 of Valognes.
Draining the water from the basin in a sealed tipper.
Pond clearing by slurry pump to protect the geomembrane.
Removal of the Crassula by manual or mechanical pulling and sealed tipper for transport.
Burial of mud and Crassula in a plot DIRNO 6.5 km.
Stock of pampa grass at the deposit site to be buried with the crassula and integration of the land of disturbance present at the deposit site in the final remodeling.
Cracking and control of Helms Crassula in the CIS basin 21 of Valognes.
Draining the water from the basin in a sealed tipper.
Pond clearing by slurry pump to protect the geomembrane.
Removal of the Crassula by manual or mechanical pulling and sealed tipper for transport.
Burial of mud and Crassula in a plot DIRNO 6.5 km.
Stock of pampa grass at the deposit site to be buried with the crassula and integration of the land of disturbance present at the deposit site in the final remodeling.
The crassula stretches for about 5,600 m
The amount of mud is to be estimated by the candidates. The site will be available for visits by appointment.