BIM planning services Sonneberg traffic station.
Planning services in Lph 1/2 (optionally 3 to 7) as object planning and specialist planning in the performance specifications:
— traffic system,
- Technical equipment,
— structural engineering staircase.
For the planned reconstruction, which includes the following measures:
— new construction of the middle platform 4/5 with direct elevation to 0.76 m above SO, then a platform edge at platform 5 with a platform height of 0.55 m above SO,
— renewal of stair systems from the PU to platform 4/5,
— adaptation of elevator systems and stair systems for urban passenger transfer from platform 4/5,
— replacement of platform equipment including route control system and signage platform 4/5,
— new construction of the entire lighting system including customer information systems and outsourcing the electrical energy system from the EC,
— dismantling the DB Station & Service systems that are no longer needed.