The main landscaping services to be provided are:
- dissolve, convey, dispose of approx. 530m³ of soil / - supply and install approx. 120m³ of soil / - supply and install approx. 330m³ FSS
- supply and install approx. 420 m³ KTS
- about 10pcs gratings / -about 12 yard branches
- about 420m concrete and granite edgings
- approx. 1,900 m² concrete paving / - approx. 120 m² sealed concrete slabs
- approx. 430 m² compacted gravel base course
- about 10 trees planted
- approx. 6 m² planting areas with R+D care / - approx. 130 m² lawn / meadow sowing with R+D care
1. Project description
The State Vocational School Centre in 89420 Höchstädt a.d. Donau will be partially demolished and rebuilt in a total of 4 construction phases
and rehabilitated. The school center is divided on two sides of the stream, north and south, of the Pulverbach. This division is also at the same time the
Division into practical and theoretical parts.
The content of the following tender is the construction phase 1A, north of the Pulverbach on the practical part for the construction of the outdoor facilities and
Paving work in the ground halls.
The pedestrian access for pupils takes place from the school area south of the Pulverbach via the existing
Pedestrian walkway on a direct route to the future main entrance of the practice building.
Another side entrance leads via the depot with the option of a green connection - not included in the scope of the project - through the
existing arboretum up to the student dormitory.
Arranged parallel to Deisenhofer Straße, the building is accessible via a side entrance for the teachers, visitors and deliverers parked there
etc. attainable.
For functional, economic and ecological reasons, the depot will be completely paved with composite stone paving. On the border with the
Seven bulk material boxes as well as further storage boxes made of interlocked concrete masonry blocks (so-called Duplo blocks) will be added to the existing arboretum.
built.
A compost site and a washing area for equipment/vehicles are fixed with sealed covering. The drainage of the washing area
is also carried out via a petrol separator
The terrain is largely flat, only the access road will be accessible in the developed state via a gradient of about 10%.
There are no existing trees and shrubs on the site itself. In the peripheral area is the existing arboretum of the school, which
needs to be protected, 2 trees are felled here. The adjacent green areas may not be driven on. The areas are:
to protect accordingly.
2. Essential services
The following specification of the landscaping work includes the 1st construction phase 1A. The measure is part of the
Overall measure.
Within the outdoor facilities, completion and development maintenance is separated in terms of billing, quantity and mass
on target.
The main landscaping services to be provided are:
- dissolve, convey, dispose of approx. 530m³ of soil
- supply and install approx. 120 m³ of soil
- supply and install approx. 330 m³ FSS
- supply and install approx. 420 m³ KTS
- approx. 10 pcs gratings
- about 12 farm branches
- approx. 420 m concrete & granite enclosures
- approx. 1,900 m² concrete pavement
- approx. 120 m² sealed concrete slabs
- approx. 430 m² compacted gravel base course
- about 10 trees planted
- approx. 6 m² planting areas with R+D care