The planned building is a new elementary school with an integrated sports hall. The non-basement building has a ground floor, 5 upper floors, and in some areas a sixth upper floor for getting out to the roof technology. The sports hall is on the fourth / fifth floor.
The order includes the locksmith work, the interior doors, the locking system and the signage.
The locksmith work includes the manufacture, supply and installation of
Steel railings in the interior, handrails made of tubular steel, and exits from galvanized sheet steel (grating) and the like Pedestals.
The interior door package is divided into metal and wooden doors. The metal doors are designed as aluminum-glass door elements with and without skylights. The wooden doors are solid doors made of wood-based materials with glass cutouts, skylights and side lights, as well as solid doors. They vary in your requirements for e.g. B. moisture pollution, sound insulation, and in their accessories.
The locking system is a data networked locking system with integrated read / write technology.
The signage includes room signs in removable frames made of stainless steel, amok signs as PVC rigid foam panels, door signs made of aluminum, office signs on metal plates, escape and rescue route plans, other warning stickers and prohibition and mandatory signs made of foil. Continuous protection for glass surfaces and a school sign made of aluminum belly bars are also required.