Playing field renewal including lawn heating and irrigation system
Here. Construction work outdoor sports facilities.
- approx. 11 320 m
- approx. 100 m
- approx. 11 300 m
- approx. 3 250 m
- approx.11,400 m
- supply approx. 250 t lime-cement mixed binder;
- approx. 9 400 m
- approx. 1 255 m
- approx. 240 m
- supply and lay approx. 1 750 m of drainage pipes PE DN 100 ... DN 150;
- Deliver and lay approx. 440 m PP sewer pipe DN 100 ... DN 160;
- Deliver and install 5 pieces of chute DIN 4034, DN 1,000;
- Deliver and install 6 pieces of plastic inspection chute DN 500;
- deliver and move approx. 400 m of hollow stone concrete;
- Deliver and lay approx. 75 m drain pipe PE DN 355;
- Deliver and lay approx. 1 060 m PE pressure pipe DN 25 ... DN 65;
- 15 pieces pop-up sprinklers as part / full circle sprinklers;
- 1 piece fully electronic control unit for irrigation system;
- Deliver and lay approx. 320 m of PE 100 SDR11 da180 pipeline as a supply / distributor manifold;
- Deliver and lay approx. 4,200 m of 25x2.3 mm clamping rail;
- Deliver and lay approx. 40,000 m PEXa 25x2.3 mm heating pipe;
- approx. 8,000 m
- Deliver and store approx. 1 360 t lawn base layer mixture;
- approx. 8,000 m
- approx. 8,000 m
- approx. 1 400 m
- approx. 380 m
- Deliver approx. 400 m curb concrete 100 x 25 x 8 cm, partially cut and move;
- approx. 1 400 m
- Deliver and assemble 2 pieces of soccer goal according to DIN 748 and complete with GS mark;
- Deliver and assemble 6 corner and center flags;
- Deliver and assemble 2 players and coaches' cabins for 15 people;
- 1 piece cabin as before, but 4 people.