Conversion of the building in 2001 in the old barracks into an 11-group daycare center
In order to prepare the building for the use of a KiTa, extensive demolition measures and a large number of new construction measures are necessary.
This is lot 17 - drywall work with the following main dimensions:
- approx. 2,088 sqm plasterboard assembly walls,
- approx. 339 sqm facing shells,
- approx. 69 pieces of door openings,
- approx. 457 sqm plasterboard ceilings, sloping roof cladding,
- approx. 3 095 sqm Mineral fiber ceiling,
- approx. 230 sqm hygienic acoustic ceiling,
- approx. 195 sqm shock-proof acoustic ceiling, class A,
- approx. 465 m Gika edge frieze and debris,
- Dismantle approx. 700 running meters of fire protection cladding steel girders and supports,
- manufacture approx. 875 running meters of fire protection cladding steel girders and supports,
- approx. 38.5 sqm shaft walls F90,
- approx. 82 running meters of ceiling aprons F30.