Clinic construction work | Tenderlake

Clinic construction work

Contract Value:
-
Notice Type:
Contract Notice
Published Date:
23 October 2019
Closing Date:
26 November 2019
Location(s):
DE221 Landshut, Kreisfreie Stadt (DE Germany/DEUTSCHLAND)
Description:
153 Hospital Vilsbiburg - Extension and structural adjustment - 153-3030-01 Sanitary

153 Hospital Vilsbiburg - Extension and structural adjustment.

- approx. 21 pieces of washbasin systems,

- approx. 1 St. surgical trough,

- approx. 15 St. WC systems,

- approx. 8 St. shower systems,

- approx. 7 pcs. Pouring systems,

- approx. 800 m sewage pipe DN 50 - 125 cast iron and plastic, partly with thermal insulation,

- approx. 650 m rainwater pipe DN 40 - 150 PE vacuum system,

- approx. 15 St. roof entrance,

- approx. 17 hours floor drain,

- approx. 2,700 m drinking water pipe stainless steel DN 12 - DN 80, partially with thermal insulation,

- approx. 40 m drinking water pipe PE-HD DN 40 - DN 65,

- approx. 90 St. shut-off valves drinking water,

- approx. 135 St. Flush-mounted shut-off valves for drinking water,

- approx. 30 St. flow divider fittings,

- about 6 purging devices,

- approx. 1 pressure booster,

- approx. 3 St. drinking water distributors,

- approx. 1 St. circulation pump,

- approx. 1 pc. Electrodeionisation unit,

- approx. 1 pc water softening system,

- approx. 2 St. FL dry feed-in cabinets,

- approx. 7 St. FL dry sampling points,

- approx. 160 m fire extinguishing pipe stainless steel,

- Fire protection measures.

Download full details as .pdf
The Buyer:
La.KUMed Krankenhaus Landshut-Achdorf, vertreten durch die Vorstandsvorsitzende Fr. Dr. Flieser-Hartl
CPV Code(s):
45215130 - Clinic construction work
45332000 - Plumbing and drain-laying work
45332200 - Water plumbing work
45332400 - Sanitary fixture installation work