Steel construction work 3 BusPort systems
At the Lindenberg bus depot, 3 BusPort facilities for approx. 160 buses of the BSVG are to be built in open construction with dividing fire walls.
The construction of the BusPort facilities will be carried out in 3 construction phases.
Size BusPort 1 = approx. 44.0m x 86.0m, height approx. 8.00m
Size BusPort 2 = approx. 44.0m x 126.0m, height approx. 8.00m
Size BusPort 3 = approx. 37.0m x 86.0m, height approx. 8.00m
The subject of this tender for 3 BusPort installations are:
- Steel construction work of the roof structures
- Trapezoidal sheet metal work of the roof covering
- Skylight strips for smoke and heat extraction, BusPort systems 1+2
- Plumbing, roof drainage
- Fire doors T 90 for the fire walls
- Aufstiegsleitern, Vogelabwehrnetze